Why us
Why choose this service
- Add space without the cost of movingA well-designed extension can add significant living space and increase your property value - often at a fraction of the cost of upsizing in London.
- Planning and structural work fully managedWe handle planning permission applications, party wall agreements, and structural engineering so you do not have to deal with councils or consultants.
- Minimal disruption to your daily lifeOur site team works to a structured schedule and keeps your home as liveable as possible throughout the build. We set clear timelines before work starts.
How we work
Our process
- Extension type selection and technical planningWe assess your property, advise on the right extension type for your space and budget, and prepare technical drawings and planning documents.
- Structural work and envelope constructionFoundations, brickwork, steelwork, roofing and windows are installed by our experienced structural team to building regulation standards.
- Internal finishing and snaggingPlastering, flooring, electrics, plumbing connections, and decoration are completed and signed off through a thorough snagging process before handover.
Scope
What's included
- Structural engineering and calculationsAll structural elements - foundations, steelwork, load-bearing changes - are designed by a structural engineer and signed off by building control.
- Party wall agreement supportWhere your extension is close to a shared boundary or wall, we advise on party wall obligations and can recommend a party wall surveyor.
- Full build - groundworks to finishingFoundations, drainage, brickwork, roofing, windows, internal plastering, flooring, electrics, and decoration. Everything to a move-in standard.
- Building regulation sign-offWe manage all building control inspections throughout the build and obtain your completion certificate on handover - essential for future property sales.
Recent work
Case studies

Chelsea
Rear Kitchen Extension
Full rear extension in Chelsea adding an open-plan kitchen and dining space. Structural steelwork, bi-fold doors, underfloor heating, and full internal fit-out completed in 10 weeks.

Central London
Side Return Transformation
Side return extension in Central London recovering a narrow passage to create a wider kitchen and utility room. Included rooflights, structural steelwork, and full replastering.
Answers
Frequently asked questions
Will we still be able to live in the home during extension works?
In many cases yes. We phase works to reduce disruption and explain access, dust control, and timing from the start.
Can you help us choose the right extension type?
Yes. We help compare rear, side, and wraparound options based on your property layout and budget goals.
Do I need planning permission for a house extension in London?
Many rear and side extensions fall under Permitted Development rights and do not require planning permission, as long as they meet size and design criteria. However, properties in conservation areas, listed buildings, or flats are subject to stricter rules. We assess your property at the initial consultation and advise you before any work begins.
How long does a house extension take in London?
A typical single-storey rear extension takes 8-12 weeks on site once planning is approved. Double-storey extensions usually take 12-16 weeks. Planning and design adds 8-12 weeks before site work begins. We provide a full project timeline in your written quote.
How much does a house extension cost in London?
Costs vary depending on size, type, specification, and location. We provide a full written quote after visiting your property with no hidden costs.
Explore
Related services
Many extension projects combine with other works. Explore related services.
