Why us
Why choose this service
- One team from planning to handoverWe manage every stage in-house - planning applications, structural engineering, groundworks, build, and interior finishes. One point of contact throughout.
- Clear milestones, no surprisesEvery project runs on a fixed written programme with clear phase milestones. You know what is happening, when it is happening, and what it costs at every stage.
- Built to full building regulation standardAll new build work is carried out to full UK building regulation compliance, with sign-off at each structural stage and a completion certificate on handover.
How we work
Our process
- Pre-construction planning and approvalsWe work with you on the initial brief, prepare or review architectural drawings, submit planning applications, and manage all pre-construction approvals before groundwork begins.
- Groundworks and structural buildFoundations, drainage, concrete or timber frame, external envelope, roofing, windows and doors are delivered by our experienced structural team.
- Interior fit-out and handoverFirst and second fix electrics and plumbing, insulation, plastering, flooring, kitchen, bathrooms, joinery, decoration, and full snagging before keys are handed over.
Recent work
Case studies

North London
Modern Family Home Build
Three-bedroom new build in North London on an infill plot. Full planning permission obtained, structural build completed in 6 months, interior fit-out in 3 months. Delivered to budget with completion certificate.

East London
Compact Urban New Build
Two-bedroom urban new build in East London maximising a narrow plot. Custom structural design, rear terrace, open-plan ground floor, and full interior finish delivered from planning to handover.
Answers
Frequently asked questions
How long does a new build project usually take?
Most new build timelines depend on planning complexity and design scope, but we provide a clear stage-by-stage timeline before work starts.
Do you help with planning and technical coordination?
Yes. We support the build process from pre-construction planning through site execution and final handover.
How long does a new build take in London?
A typical residential new build takes 12-20 months from planning application to handover. The planning stage alone can take 3-4 months. We provide a full project programme at the initial consultation so you have a realistic timeline before committing.
Do you manage planning permission for new builds?
Yes. We work with architectural partners to prepare planning drawings and submit applications to the relevant London borough council. We manage the process and respond to planning queries on your behalf.
Can you build on my plot in London?
We assess all plots across London for feasibility, planning potential, and structural constraints. Infill plots, garden plots, and side-land plots are all considered. Contact us with your plot details and we will arrange an initial consultation.
Explore